Renewable Energy Projects by BEI Construction
State Fund Portfolio | Northern California (Multiple sites)
10.6MW distributed generation (across 4 sites) Vacaville, Pleasanton, Redding, Sacramento
BEI completed electrical and underground construction for ground- and canopy-mounted arrays. Scope also included installation and integration of 22 security cameras throughout the canopy array. This was a California DSA project
Distributed Generation | Solar | EV Charging | BESS
Mountain View Unified School District | Mountain View, CA
Solar | EV Charging
BEI built 1.6 MW of carport canopy PV systems across 10 schools. 12 EVC stations in 10 schools.
Graton Casino | Rohnert Park, CA
Solar
2.125 MW rooftop solar system for the Graton Casino. BEI installed MV gear, inverters, conduit, wiring, racking, and set 4,722 450-Watt modules.
Aquamarine | Stratford, CA
250 MW Solar, 230kV Substation
Substation | Solar
City of Salinas | Salinas, CA
Distributed Generation | Solar
3.7 MW distributed generation/solar. BEI completed electrical and underground construction for ground- and canopy-mounted arrays. California Division of the State Architect (DSA).
Goleta Energy Storage | Tesla | Goleta, CA
60MW/160MWh (44 Tesla Megapacks)
BESS
Reid Gardener | Energy Vault | Moapa, NV
220MW/440 MWh
BESS
Southern California Energy Storage | Ameresco |
Porterville, Rancho Cucamonga, and Long Beach, CA
537.5MW/2.15GWh (across 3 sites)
BESS
High Desert | Victorville, CA
230kV Substation
Substation