ENERGY STORAGE Projects by BEI Construction

Vallecito
Carpinteria CA
10MW BESS
Renewable energy / battery
Electrical construction of battery energy storage systems facilities comprised
of 15 Tesla Mega Packs.
• Design Build
• Blymyer Engineers

Agua Fria – SRP
25 MW BESS
Construction of 35 Tesla Mega Packs
• Design Build
• Blymyer Engineers

Clover Flats
843kW
Renewable energy / biomass
Electrical installation, medium voltage, electrical, underground construction
and civil concrete foundations.

Tesla/Gap
1 MW/2MWh
Renewable energy / solar
Battery plant. Design/build.

Hayward Unified School District
Distributed Generation, Solar
Hayward, CA
BEI installed of 9.6 MW of solar shade canopies across 33 school campuses. BEI furnished and installed 6 Battery Energy Storage Systems. Scope included infrastructure, grounding, underground, and civil work, battery installation, enclosure, and startup and commissioning for the 6 batteries. Additional scope included infrastructure, wiring, and installation of 48 dual-port EVC stations.

Mission College
Energy Storage, Solar
San Jose, CA
BEI furnished 5,300 panels and installed 2.5 MW in carport canopies across 1.7 acres. BEI installed a 1 MW/2.7 MWh battery.