ENERGY STORAGE Projects by BEI Construction
Goleta Energy Storage | Tesla | Goleta, CA
60MW/160MWh (44 Tesla Megapacks)
BESS
Reid Gardener | Energy Vault | Moapa, NV
220MW/440MWh
BESS
Southern California Energy Storage | Ameresco |
Porterville, Rancho Cucamonga, and Long Beach, CA
537.5MW/2.15GWh (across 3 sites)
BESS
Wellhead Stanton | Energy Vault | Stanton, CA
68.8MW/275.2MWh
BESS
Santa Ana Energy Storage | Calpine | CA
40MW/160MWh
BESS
Geysers | Calpine | Middletown, CA
60MW/240MWh
BESS
Vallecito | Carpinteria CA
10MW BESS
Renewable energy / battery
Electrical construction of battery energy storage systems facilities comprised
of 15 Tesla Mega Packs.
Design Build Blymyer Engineers.
Agua Fria – SRP | Glendale, AZ
25MW BESS Construction of 35 Tesla Mega Packs.
Design Build Blymyer Engineers.