Constructing Data Centers that Power Artificial Intelligence (AI) Learn More
Solar/PV Projects by BEI Construction
State Fund Portfolio | Northern California (Multiple sites)
Distributed Generation/ Solar
10.6 MW distributed generation solar project. BEI completed electrical and underground construction for ground- and canopy-mounted arrays. Scope also included installation and integration of 22 security cameras throughout the canopy array. This was a California DSA project
Graton Casino | Rohnert Park, CA
Rooftop Solar
2.125 MW rooftop solar system for the Graton Casino. BEI installed MV gear, inverters, conduit, wiring, racking, and set 4,722 450-Watt modules.
City of Salinas | Salinas, CA
Distributed Generation/ Solar
3.7 MW distributed generation/solar. BEI completed electrical and underground construction for ground- and canopy-mounted arrays. California Division of the State Architect (DSA).
Mountain View Unified School District | Mountain View, CA
Solar and EVC
BEI built 1.6 MW of carport canopy PV systems across 10 schools. 12 EVC stations in 10 schools.
San Jose Unified School District | San Jose, CA
Renewable Energy/ Solar
7.2 MW of solar across multiple sites. BEI completed electrical and underground construction for ground- and canopy-mounted arrays. California Division of the State Architect (DSA).
City of Palmdale/Keppel United School District
Renewable Energy/Solar | Design/Build, Solar
2 MW
EPC, 12 sites, design/build, underground construction, DSA, ADA.
EPC for City of Palmdale. Complete PV installations at 8 sites for the City of Palmdale, California. Mixed ground-mount and canopy-mount arrays. One megawatt total. Turnkey services and ongoing O&M.
Acalanes Union High School District/SolarCity
Renewable Energy/Solar
Lafayette, CA
1.7 MW of solar in four schools
Completed the installation of PV (photovoltaic) and battery storage electrical systems. Electrical installation and underground construction. Schools include Las Lomas, Acalanes, Miramonte and Campolindo.
Merritt College
Renewable Energy/Solar
Oakland, CA 2010
1.2 MW
Electrical and underground construction for ground- and canopy-mounted arrays. California Division of the State Architect (DSA).
Solar City/Intel Folsom
Renewable Energy/Solar
6 MW solar and 1 MW/2 MWh battery
Electrical construction including battery plant, solar and parking canopies.